Investorideas.com newswire, breaking water news

Tuesday, January 17, 2023

#GreenMetal #Stock News- Defense Metals (TSX-V: $DEFN.V) (OTCQB: $DFMTF) announces more Rare Earth Assay Results from Wicheeda Project Drilling; @defensemetals Including 30 metres of 3.77% TREO

 

#GreenMetal #Stock News- Defense Metals (TSX-V: $DEFN.V) (OTCQB: $DFMTF) announces more Rare Earth Assay Results from Wicheeda Project Drilling; @defensemetals Including 30 metres of 3.77% TREO

 


Vancouver, British Columbia – January 17, 2023: Investorideas.com Newswire, -Mining/Metals/ Green Energy Stock news-  Defense Metals Corp. (“Defense Metals” or the “Company”) (TSX-V:DEFN / OTCQB:DFMTF/ 35D: FSE) is pleased to announce Rare Earth Element (“REE”) assay results from an additional eight core drill holes, totalling 2,104 metres (“m”), completed during 2022 at its 100% owned Wicheeda REE Deposit. These assay results are from two exploration, three resource delineation, and three pit slope geotechnical core drill holes, one of which (hole WI22-73) returned the second longest REE-mineralized intercept of the 2021 and 2022 Wicheeda drilling campaigns (10,859 metres in 47 core holes).

 

Read this news, featuring DEFN in full at https://www.investorideas.com/news/2023/mining/01171DEFN-Rare-Earth-Assay.asp

 

Pit slope geotechnical drill hole WI22-74 (-65o dip at azimuth 139o) drilled into the south pit wall intersected high-grade mineralized dolomite carbonatite that assayed 3.77% total rare earth oxide (“TREO”) over 30 metres (“m”) from surface and 2.52% TREO over 59 m at mid-hole depths, within a broader zone averaging 2.03% TREO over a 192 m interval (see Table 1 and Figure 1).

 

Resource delineation drill holes WI22-71 (-50o dip at 163o azimuth) and WI22-73 (-60o dip at azimuth 134o) drilled within the central area of the deposit similarly intersected mineralized dolomite-carbonatite, from surface, assaying 2.83% TREO over 66 m and 2.35% TREO over 81 m, respectively; within broader mineralized zones yielding 1.47% TREO over 207 m, and 1.42% TREO over 222 m, respectively (see Table 1 and Figure 1).

 

Resource delineation and pit slope geotechnical drill holes WI22-76 (-55o dip at 242o azimuth) and WI22-77 (-70o dip at 348o azimuth) returned moderate-grade, mixed syenite-xenolithic dolomite carbonatite intervals from the northern limit of the Wicheeda Deposit and north pit wall that assayed 0.64% TREO over 151 m; and 0.67% TREO over 76 m, respectively (see Table 1 and Figure 1).

 

 Kristopher Raffle, P.Geo., Director of Defense Metals and a Qualified Person stated:

“We are excited to be nearing the release of our final drill results from a very successful year of drilling. It’s very telling that one of our geotechnical drill holes not only gave us important data about future open pit slope design, but also yielded one of the best drill intercepts of our 2021 and 2022 drill programs. Following the receipt of assays from our two remaining geotechnical drill holes, we will update the Wicheeda mineral resource based on more than 10,000 metres in the 47 drill holes Defense Metals has completed post-PEA. We firmly believe Wicheeda is one of the best rare earths projects globally and we eagerly look forward to advancing the project during 2023.”

High-wall pit slope geotechnical drill hole WI22-75 (-60o dip at 110o azimuth), collared 100 m east of the Wicheeda Deposit, and greenfield exploration drill holes WI22-65 (-60o dip at 140o azimuth) and WI22-66 (-60o dip at 140o azimuth), which targeted REE soil geochemical anomalies 500 m southwest and 1,000 m northwest of the Wicheeda Deposit, did not return significant REE mineralization.

Table 1. Wicheeda REE Deposit 2022 Diamond Drill Intercepts[1]

Hole ID

From (m)

To

(m)

Interval (m)

TREO[2] (%)

Ce2O(%)

La2O(%)

Nd2O(%)

Pr2O(%)

Sm2O(ppm)

Gd2O3 (ppm)

Eu2O3 (ppm)

Dy2O3 (ppm)

Tb4O7 (ppm)

Ho2O3 (ppm)

WI22-71 (163/-50)

3.5

210

206.5

1.47

0.72

0.48

0.18

0.06

203

99

43

31

9

4

including

3.5

69

65.5

2.83

1.38

0.96

0.32

0.11

327

147

66

36

12

4

WI22-73 (134/-60)

2.3

224

221.7

1.42

0.69

0.46

0.17

0.06

203

100

45

35

10

5

including

2.3

83.5

81.2

2.35

1.14

0.80

0.26

0.09

281

123

57

34

11

4

WI22-74 (139/-65)

2.5

194

191.5

2.03

0.99

0.68

0.23

0.08

247

111

50

30

9

4

including

2.5

32.5

30

3.77

1.83

1.33

0.39

0.15

342

144

68

38

12

4

and

59

115.8

56.8

2.52

1.22

0.87

0.27

0.10

279

120

55

30

10

4

WI22-76 (242/-55)

125

276

151

0.64

0.31

0.20

0.08

0.03

104

60

27

27

7

4

WI22-77 (348/-70)

16.5

93

76.5

0.67

0.32

0.20

0.09

0.03

160

104

44

45

11

6

Previously

Reported

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WI22-62 (204/-50)

93

260

167

1.39

0.68

0.43

0.18

0.06

222

101

43

29

9

4

including

121

169

48

2.29

1.13

0.72

0.29

0.10

316

123

54

22

9

2

WI22-63 (204/-60)

148

187

39

2.29

1.12

0.79

0.25

0.09

246

120

47

26

9

3

including

175

184

9

5.08

2.45

1.84

0.52

0.19

472

215

91

49

17

5

WI22-64 (204/-65)

77

269.3

192.3

1.78

0.86

0.58

0.22

0.08

230

116

51

34

10

4

including

77

150

73

3.13

1.51

1.06

0.37

0.13

353

156

71

30

12

3

WI22-67 (197/-60)

30.7

137

106.3

2.53

1.22

0.87

0.28

0.10

307

149

66

36

13

4

including

41

100

59

3.42

1.65

1.19

0.37

0.14

381

184

80

40

16

4

WI22-68 (220/-55)

109.4

233

123.6

3.58

1.69

1.29

0.38

0.14

376

160

71

35

12

3

including

212

230

18

6.70

3.11

2.50

0.71

0.27

619

260

111

47

18

5

WI22-69 (230/-50)

93

314

221

2.14

1.02

0.74

0.24

0.09

260

126

56

36

11

4

including

93

204

111

3.52

1.68

1.25

0.37

0.14

390

181

81

45

16

5

WI22-70 (234/-55)

117

230

113

2.50

1.20

0.84

0.29

0.10

352

180

74

58

17

7

WI22-72 (167/-70)

3

125

122

2.56

1.25

0.85

0.29

0.11

308

139

63

40

12

5

including

3

58

55

3.02

1.47

1.02

0.34

0.12

345

135

69

34

12

4

and

125

222

97

0.90

0.44

0.27

0.12

0.04

152

80

35

30

8

4

 

 

 

 

 

 

Figure 1. Wicheeda REE Deposit Long Section Looking East

 


 

Geotechnical drill hole data collected will support future pre-feasibility level mine planning studies (see Defense Metals’ news release dated May 24, 2022). The 2022 Wicheeda REE Deposit resource delineation and pit slope geotechnical drill program comprised 18 core drill holes totalling 5,510 m (~18,077 feet). Assay results have been announced for a total of 16 holes to date, with results of the remaining two holes expected shortly.

 

About the Wicheeda REE Property

 

The 100% owned, 4,262-hectare (~10,532-acre) Wicheeda REE Property is located approximately 80 km northeast of the city of Prince George, British Columbia; population 77,000. The Wicheeda project is readily accessible by all-weather gravel roads and is near infrastructure, including power transmission lines, gas pipelines, the Canadian National Railway, and major highways.

 

The 2021 Wicheeda REE Project Preliminary Economic Assessment technical report (“PEA”) outlined a robust after-tax net present value (NPV@8%) of $517 million and an 18% IRR[3]. This PEA contemplated an open pit mining operation with a 1.75:1 (waste:mill feed) strip ratio providing a 1.8 Mtpa (“million tonnes per year”) mill throughput  producing an average of 25,423 tonnes REO annually over a 16 year mine life. A Phase 1 initial pit strip ratio of 0.63:1 (waste:mill feed) would yield rapid access to higher grade surface mineralization in year 1 and payback of $440 million initial capital within 5 years.

 

Methodology and Quality Assurance/Quality Control

 

The analytical work reported on herein was performed by ALS Canada Ltd. (“ALS”) at their Langley (sample preparation) and Vancouver (ICP-MS fusion), B.C. facilities. ALS is an ISO-IEC 17025:2017 and ISO 9001:2015 accredited geoanalytical laboratory and is independent of the Defense Metals and the QP. Drill core samples were subject to crushing at a minimum of 70% passing 2 mm, followed by pulverizing of a 250-gram split to 85% passing 75 microns. A 0.1-gram sample pulp was then subject to multi-element ICP-MS analysis via lithium-borate fusion to determine individual REE content (ME-MS81h). Defense Metals follows industry standard procedures for the work carried out on the Wicheeda Project, with a quality assurance/quality control (“QA/QC”) program. Blank, duplicate, and standard samples were inserted into the sample sequence sent to the laboratory for analysis. Defense Metals detected no significant QA/QC issues during review of the data.

 

Qualified Person

 

The scientific and technical information contained in this news release as it relates to the Wicheeda REE Project has been reviewed and approved by Kristopher J. Raffle, P.Geo. (B.C.), Principal and Consultant of APEX Geoscience Ltd. of Edmonton, Alberta, who is a director of Defense Metals and a “Qualified Person” (“QP”) as defined in NI 43-101. Mr. Raffle has verified the data, which included a review of the sampling, analytical and test methods underlying the data, information and opinions disclosed herein. 

 

About Defense Metals Corp.

 

Defense Metals Corp. is a company focused on the development of its 100% owned Wicheeda Rare Earth Element mineral deposit, located near Prince George, British Columbia, Canada, that contains metals and elements commonly used in in green energy, aerospace, automotive and defense technologies. Rare earth elements are especially important in the production of magnets used in wind turbines and in permanent magnet motors for electric vehicles.  Defense Metals Corp. trades in Canada under the symbol “DEFN” on the TSX Venture Exchange, in the United States, under “DFMTF” on the OTCQB and in Germany on the Frankfurt Exchange under “35D”.

 

For further information, please contact:

 

Todd Hanas, Bluesky Corporate Communications Ltd.

Vice President, Investor Relations

Tel: (778) 994 8072

Email: todd@blueskycorp.ca

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

 

Cautionary Statement Regarding “Forward-Looking” Information

 

This news release contains “forwardlooking information or statements within the meaning of applicable securities laws, which may include, without limitation, statements relating to advancing the Wicheeda REE Project, drill results including anticipated timeline of such results/assays, the Company’s plans for its Wicheeda REE Project, expanded resource and scale of expanded resource, expected results and outcomes, plans to complete a PFS, the technical, financial and business prospects of the Company, its project and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of rare earth elements, the anticipated costs and expenditures, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates, the potential for unexpected costs and expenses and those other risks filed under the Company’s profile on SEDAR at www.sedar.comWhile such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather and climate conditions, failure to maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain community acceptance (including First Nations),  risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of personnel, materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological and engineering assumptions, decrease in the price of rare earth elements, the impact of Covid-19 or other viruses and diseases on the Company’s ability to operate, an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to, the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, loss of key employees, consultants, or directors, increase in costs, delayed drilling results, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forwardlooking statements or forwardlooking information, except as required by law.

 

Disclaimer/Disclosure: Investorideas.com is a digital publisher of third party sourced news, articles and equity research as well as creates original content, including video, interviews and articles. Original content created by investorideas is protected by copyright laws other than syndication rights. Our site does not make recommendations for purchases or sale of stocks, services or products. Nothing on our sites should be construed as an offer or solicitation to buy or sell products or securities. All investment involves risk and possible loss of investment. This site is currently compensated for news publication and distribution, social media and marketing, content creation and more. Contact each company directly regarding content and press release questions. Disclosure   this  DEFN news is a paid news release on investorideas.com – learn more about costs and services https://www.investorideas.com/News-Upload/  More disclaimer info: https://www.investorideas.com/About/Disclaimer.asp Please read Investorideas.com privacy policy: https://www.investorideas.com/About/Private_Policy.asp

About Investorideas.com

https://www.investorideas.com/About/

 

Sign up for free stock news alerts at Investorideas.com

https://www.investorideas.com/Resources/Newsletter.asp

 


Renewable Energy Stocks: investing ideas in renewable energy stocks

Like Renewable Energy Stocks? View our Renewable Energy Stocks Directory

Get News Alerts on Renewable Energy Stocks

 



Mining Sector Stocks- investing ideas in mining stocks

Like Mining Stocks? View our Mining Stocks Directory  

Get News Alerts on Mining Stocks

 



[1]The true width of REE mineralization is estimated to be 70-100% of the drilled interval.

[2]TREO % sum of CeO2, La2O3, Nd2O3, Pr6O11, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3 and Ho2O3.

[3] Independent Preliminary Economic Assessment for the Wicheeda Rare Earth Element Project, British Columbia, Canada, dated January 6, 2022, with an effective date of November 7, 2021, and prepared by SRK Consulting (Canada) Inc. is filed under Defense Metals Corp.’s Issuer Profile on SEDAR (www.sedar.com).

No comments: